Light where it is needed
A rooflight lets in far more daylight than a window of the same size in a wall. Positioned over the deepest part of a room, often where the extension meets the old house, it lights the space that would otherwise be darkest.
Heat and glare
Large areas of south- or west-facing glass can overheat a room in summer. Solar-control glass, external shading and opening rooflights for ventilation should be considered at design stage, and the Building Regulations now limit overheating in new dwellings and set standards for heat loss through glazing.
Frames and structure
Slim aluminium or steel frames give the cleanest look, but larger panes are heavy and need structure designed for them, and large units may need craning into position. Lead times for bespoke glazing are often the longest in the programme, so it is ordered early, once openings are fixed.
Installation and weathering
Most problems with glazing are at the edges: the upstands, flashings and drainage around rooflights and the thresholds of doors. Level thresholds need drainage channels outside, and every junction needs a clear detail before the frames go in.
Common questions
Fixed or opening rooflights?
Opening rooflights help ventilate and cool a room in summer; fixed units are cheaper and slimmer. Many extensions use a mix.
What is the lead time for bespoke glazing?
Often several weeks from approval of the shop drawings, which is why openings are confirmed and glazing ordered early in the programme.