Programme and site

Planned maintenance for landlords and managing agents

Most expensive building repairs started as small, cheap ones that were left too long.

Galley kitchen at Garratt Lane with doors opening to the balcony
Garratt Lane, Wandsworth: a refurbished galley kitchen in an apartment. See the project

Planned versus reactive

Reactive maintenance deals with problems as they are reported. Planned maintenance looks ahead: gutters cleared before winter, roofs and pointing inspected, decorations kept up, and components replaced before they fail. Over time it costs less and causes less disruption for tenants.

A prioritised schedule

A walk-round survey produces a list of works, ranked by urgency and grouped so that the same access, scaffolding or trade visit covers several items. Phased across a budget year, it avoids paying for scaffolding twice.

Compliance

Landlords have legal duties around gas safety, electrical safety, smoke and carbon monoxide alarms and fire safety in common parts. Maintenance work should be coordinated with the certification cycle so that work and paperwork stay in step.

Void periods

The weeks between tenancies are the best time for kitchens, bathrooms, decoration and flooring. A contractor who can turn a void around to a fixed programme shortens the time without rent.

Common questions

How often should a rental property be surveyed?

An annual walk-round, with roofs and gutters checked before winter, catches most problems while they are still small.

Can maintenance be done with tenants in place?

Most of it, with notice and agreed access. Larger works are best scheduled for void periods.

Working with us

Eternal Design and Build Ltd is a CIOB Chartered Building Company working across North, West and Central London. Read more about our projects, or get in touch to discuss a property.

Enquiries

Have a project this applies to?